Checklists to manage your GYPSUM Work
1) GYPSUM PLASTER
GYPSUM PLASTER
|
|||||
Name of
Project:__________________________
|
|||||
|
|||||
Unit: Date:
|
|||||
SL
|
Description
|
Tolerances
|
Ok
|
Not
Ok
|
REMARKS
|
1
|
P.O.P bags properly sealed & Air Tight, No
damage of bags observed, & No hydration of P.O.P observed
|
|
|
|
|
2
|
Checklist for immediate preceding work
(plastering , masonry) |
|
|
|
|
3
|
Plaster Surface dry before application of P.O.P.
/ RCC surface hacked for bonding.
|
As per manufacturer guide line
|
|
|
|
4
|
All undulations removed and grinding done
wherever necessary (offset etc.)
|
|
|
|
|
5
|
Ceiling is thoroughly brushed and washed with
water spray &wire brush to remove patching tape & dust.
|
|
|
|
|
6
|
Ensure that all corners of ceiling are at right
angles.
|
3mm up to 1m length
|
|
|
|
7
|
Thickness of gypsum shall be limited to 8 mm for
ceilings & 12 mm for walls.
|
8mm for ceiling & 12mm for
walls.
|
|
|
|
8
|
Ensure that level pads are at corners/ends.
|
|
|
|
|
9
|
Work done from upside to downside starting from
ceiling.
|
As per approved methodology
|
|
|
|
10
|
Mixing done in clean buckets/ trays and make sure
that old left out mix not used with new mix at any time. Use in specify time.
|
As per manufacturer’s guideline
|
|
|
|
11
|
Surface is smooth after application of and
plumbs, right angles maintained (check using proper tools).
|
+6mm up to 3m, +10mm up to 7m
|
|
|
|
12
|
Floor cleaned after completion of work on the
same day.
|
|
|
|
|
13
|
Extra material removed with the help of knife
strip. (Protect the floor).
|
|
|
|
|
14
|
No cracks / holes / blemishes observed
|
|
|
|
|
Comments