Process of Microcontrete Flooring

Process of Microcontrete Flooring Process On Tile/Marble Flooring 1 Sand The floor with Metal Grinder & Metal Diamond Wheel. 2 Clean the surface ensuring there is no dust on the surface 3 Apply 1 coat of Colortek Neogrip – F primer in thin layer – no dilution required 4 Let dry for 8 hrs Application Process for Base & Topcoat 1. Apply 1st base coat of base coat, polymer 3kgs, water 1 kgs, base coat filler 12 kgs mix it well until all lumps are dissolved and it becomes a smooth paste. (3:1 IS RATIO FOR POLUYMER AND WATER MIXING. 4:1 IS RATION FOR POLYMER WATER MIX WITH POWDER 2. Apply in the thickness of 1-2 mm so that it gives you a coverage of 155 sqft approx.. 3. Let dry for 1 day 4. Sandin to be done by 30# grit resin pad – 8mm thick , Dcrf 7u – then sand with 60# grit resin pad – 3mm 5. Apply – 2 coats of polymer primer by diluting with water 1:1 ratio (1kgs polymer...