Posts

Showing posts from October, 2019

Checklists to manage your GYPSUM Work

1)  GYPSUM PLASTER GYPSUM PLASTER Name of Project:__­­­­­­­­­­­­­­­­­­­________________________ Unit:                                                               Date: SL Description Tolerances Ok Not Ok REMARKS 1 P.O.P bags properly sealed & Air Tight, No damage of bags observed, & No hydration of P.O.P observed 2 Checklist for immediate preceding work (plastering , masonry) 3 Plaster Surface dry before application of P.O.P. / RCC surface hacked for bonding. As per manufacturer guide line 4 All undulations removed and grinding done wherever ne...